51. The
_____ prototype is used to test out some ideas and is then discarded when the
true development of
the
operational system is commenced.
A. operational.
B. system.
C. throw-away
D. Evolutionary
ANSWER: C
52. The
______ event is constructed and tested quickly and inexpensively in order to
test the assumptions.
A. prototype.
B. data flow diagrams
C. UML diagrams
D. product based structure.
ANSWER: A
53. The
process in which the later increments might require modification to earlier
increments in known as
___________.
A. software breakage.
B. hardware breakage
C. incremental breakage
D. product breakage
ANSWER: D
54. In
__________the scope of deliverables for an increment is rigidly constrained by
an agreed deadline.
A. increment boxing
B. time boxing.
C. deadline verification
D. checkpoint verification
ANSWER: B
55. In
general any project in real time system must reach a certain _____.
A. goal
B. result
C. output
D. objectives
ANSWER: D
56. The ____
oriented system refer to embedded control systems
A. process
B. data
C. event.
D. task
ANSWER: C
57. ._______
devised the COCOMO estimating models.
A. R. Ross.
B. CCTA.
C. Barry Boehm
D. Mike cotterell.
ANSWER: D
58. The work
content of the application to be implemented is measured using _______.
A. SLOC
B. KLOC.
C. MLOC.
D. CLOC
ANSWER: A
59. A ______
is any item or person required for the execution of the project. Algorithmic
model.
A. data.
B. resource.
C. items.
D. materials.
ANSWER: B
60. In _____
step the identification of project scope and objectives
A. 7
B. 5
C. 1
D. 0
ANSWER: C