61. In _______ estimation method component tasks are identified and sized and these individual estimates
are aggregated
 A. top-down
 B. bottom up.
 C. procedural oriented
 D. algorithmic model.
 ANSWER: B
62. In prototyping, the extent to which the copies of input screen are shown to the users on the
workstation, but screens cannot actually be used is _____ .
 A. simulated interaction
 B. partial working model
 C. vertical working model.
 D. mock-ups.
 ANSWER: D
63. The ______ event is constructed and tested quickly and inexpensively in order to test the assumptions.
 A. data flow diagrams
 B. UML diagrams
 C. prototype.
 D. product based structure.
 ANSWER: C
64. The V-process model deals with expanding the activity _____.
 A. tasks.
 B. efforts
 C. testing.
 D. process.
 ANSWER: D
65. The critical path is the ________ path through the network
 A. shortest.
 B. nearest.
 C. path with interference float.
 D. longest.
 ANSWER: C
66. The _______ risks affect the organisation developing or procuring the software.
 A. product
 B. process.
 C. business
 D. project.
 ANSWER: C
67. The _____i option is used to find the approach of the identification of risks.
 A. milestone.
 B. brainstorming.
 C. risk planning
 D. risk monitoring
 ANSWER: B
68. ._____ is one of the ways of identifying possible threats to the success of a project and the measures
that might eliminate or reduce them.
 A. Causal mapping
 B. Checklists.
 C. Brainstorming.
 D. Risk assessment
 ANSWER: A
69. .________ is a planned action to be carried out if the particular risk materializes.
 A. Contingency plan
 B. Risk transfer
 C. Integration plan.
 D. Risk mitigation
 ANSWER: A
70. Risk __________is a action taken to ensure that the impact of the risk is lessened when it occurs
 A. reduction.
 B. avoidance.
 C. mitigation
 D. planning.

 ANSWER: C