SOFTWARE PROJECT MANAGEMENT - Multiple Choice Questions. 001

11. In stepwise project planning the fourth step deals with ______.
 A. project products and activities
 B. project developer and design
 C. project manager and duties
 D. project authority and rights
 ANSWER: A
12. The ______has overall the responsibility for setting, monitoring and modifying objectives of the
project.
 A. project steering committee.
 B. team manager.
 C. team member
 D. project manager.
 ANSWER: A
13. From the _______ options provide practical methods of ascertaining whether an objective has been
met.
 A. specific sub objective
 B. time constraint.
 C. measure of effectiveness.
 D. relevant sub objective.
 ANSWER: A
14. The people / client who have interest in project are called as ____.
 A. project holders
 B. stakeholders.
 C. project leader
 D. team member.
 ANSWER: B
15. _____ kind of people will be under the direct managerial control of the project leader.
 A. External to both project team and the organization.
 B. External to the project team but within the same sector
 C. Internal to the project team.
 D. External only to the project team
 ANSWER: D
16. The ______assessment deal deals with evaluating the functions of hardware and software.
 A. technical
 B. procedure .
 C. dynamic.
 D. static.
 ANSWER: A
17. The products that are used in the process of creating the deliverables are called as _______.
 A. modules.
 B. intermediates
 C. documents.
 D. quality records
 ANSWER: B
18. The relationship between the products can be documented in _____ structure.
 A. work breakdown
 B. product hierarchy.
 C. product breakdown
 D. system flow.
 ANSWER: C
19. .______ is the amount of work that needs to be done in any project.
 A. Effort
 B. Pending SLOC
 C. Elapsed work
 D. Expended work.
 ANSWER: A
20. is thinking carefully about something before you do it
 A. planning
 B. testing
 C. collecting
 D. executing

 ANSWER: A