SOFTWARE PROJECT MANAGEMENT - Multiple Choice Questions. 001

1. The ________ is in essence thinking carefully about something before you do it.
 A. testing.
 B. collection
 C. executing.
 D. planning.
 ANSWER: D
2. The _________ management is often used to co-ordinate activities on jobs.
 A. general
 B. Programmed.
 C. team
 D. unique.
 ANSWER: B
3. In general any project in real time system must reach a certain _____.
 A. goal.
 B. resul
 C. output.
 D. objectives.
 ANSWER: D
4. There are ______ numbers of steps in Stepwise project planning for real time projects
 A. 6
 B. 7
 C. 8
 D. 10
 ANSWER: D
5. In objective based projects must specify the new software and to meet the identified _______.
 A. formula
 B. requirements.
 C. feasibility study.
 D. system study
 ANSWER: B
6. Generating the solution for the problems with the newly installed system in called as ________.
 A. .architecture design
 B. detailed design
 C. requirements design
 D. acceptance support.
 ANSWER: B
7. Groups of methods or techniques are called ____.
 A. plans.
 B. methodologies.
 C. objectives.
 D. products.
 ANSWER: A
8. The projects under _______category, the system interfaces with the organization
 A. information systems.
 B. embedded systems.
 C. product based
 D. process based
 ANSWER: D
9. In ________ the system interfaces with machine and objectives.
 A. objective driven project
 B. product driven project.
 C. process driven project.
 D. embedded systems
 ANSWER: D
10. In management, ______means taking action to remedy hold-ups.
 A. planning.
 B. organizing.
 C. controlling.
 D. monitoring


 ANSWER: D