1. The
________ is in essence thinking carefully about something before you do it.
A. testing.
B. collection
C. executing.
D. planning.
ANSWER: D
2. The
_________ management is often used to co-ordinate activities on jobs.
A. general
B. Programmed.
C. team
D. unique.
ANSWER: B
3. In
general any project in real time system must reach a certain _____.
A. goal.
B. resul
C. output.
D. objectives.
ANSWER: D
4. There are
______ numbers of steps in Stepwise project planning for real time projects
A. 6
B. 7
C. 8
D. 10
ANSWER: D
5. In
objective based projects must specify the new software and to meet the
identified _______.
A. formula
B. requirements.
C. feasibility study.
D. system study
ANSWER: B
6.
Generating the solution for the problems with the newly installed system in
called as ________.
A. .architecture design
B. detailed design
C. requirements design
D. acceptance support.
ANSWER: B
7. Groups of
methods or techniques are called ____.
A. plans.
B. methodologies.
C. objectives.
D. products.
ANSWER: A
8. The
projects under _______category, the system interfaces with the organization
A. information systems.
B. embedded systems.
C. product based
D. process based
ANSWER: D
9. In ________
the system interfaces with machine and objectives.
A. objective driven project
B. product driven project.
C. process driven project.
D. embedded systems
ANSWER: D
10. In
management, ______means taking action to remedy hold-ups.
A. planning.
B. organizing.
C. controlling.
D. monitoring
ANSWER: D